What happens when a cavity barrier isn't right
If the barrier can’t be evidenced
FRAEW assessors and Building Safety Regulator reviewers work to a hard rule: no evidence is treated as no barrier. For a landlord mid-remediation, a missing evidence record can mean re-opening a wall that was already closed up – double the cost and double the resident disruption. For a Tier 1 on a new build, it’s a Gateway delay on a scheme that can’t complete or occupy until it clears.
If the install isn’t controlled
Barriers get fitted with the wrong product for the cavity, left unsealed where services pass through, or omitted at the facade interface where responsibilities blur. Once the cladding is on, none of it is visible – the defect stays hidden until the next intrusive survey or an actual fire. And not every product is tested in every configuration, so a barrier that looks installed may not perform in that specific wall.
How Ark handles it
An intrusive survey methodology that records what’s actually in the wall, photographic evidence of every barrier installed, product traceability back to the test data for that configuration, and documented coordination with the facade contractor so the barrier scope is owned rather than assumed. The external wall gets an evidence trail that stands up to a FRAEW, an EWS1 review or a Gateway submission.