Scope of Works
The primary objective was to ensure proper smoke control on the dual action doors located at the floor boxes. This involved adjusting the floor-to-door gap to the required 3mm, verifying that the frame-to-leaf gap was within tolerance, installing new smoke seals, and resealing the frame-to-wall gap using FSI Pyrocaustic.