Scope of Works
The project covered the supply and installation of Corofil Cavity Barriers, specifically engineered to provide 60 minutes of fire resistance in accordance with the fire strategy established for the building’s façade. In addition to the cavity barriers, Corofil Slab Edge systems were implemented to ensure that the horizontal slab achieved the same level of fire resistance.
All installations were executed with the utmost precision, adhering closely to the specifications outlined in the technical data sheets. The entire process was meticulously documented using the Quality Assurance (QA) application via One Trace, ensuring comprehensive tracking of compliance and performance.